Segezha Group to build container terminal in Lesosibirsk, Russia

Photo: Segezha Group

Segezha Group started construction of the new container terminal at its Lesosibirsky LDK No.1 in Russia. The aim of this project is to provide on time transportation for the increasing volumes of pellet fuels that are produced by KsyloTech-Syberia LLC. The construction will be completed by September 2020. The total investment in this project is around 9.8 million.

The project implies concreting of the container terminal site for the storage and shipment of containers with finished products and the laying of service tracks with improved track capacity and carrying capacity of up to 95 tons. This will allow monthly pellet shipments to be increased to five container trains and downtime while handling to be decreased.
Currently, there are only three container trains with eco-fuel that are shipped on a monthly basis from Lesosibirsk, Russia to the Baltic ports for further transportation to Denmark and other European countries.

According to Project Manager Evgeniy Verevkin, all works will be done by in-house manpower without any sub-contracting. “All necessary materials have been purchased, framework and butt joints have been prepared to make sure the project is running non-stop. Now, we have already started the phased pouring of steel fiber concrete, which we produce by ourselves at our own ready-mix station” he reported. At that, passway and site pavement meets the requirements of all the construction norms and regulations and national industry-wide standards applicable to these types of work.